Skip to content
Back to open items
closedClosed

Proposed changes to the Southland Water and Land Plan

Environment Southland has requested three changes to the Southland Water and Land Plan: align farm-plan rules for 20–50 hectare properties, allow riverbed work to protect infrastructure, and enable water-quality mitigations.

Closing date
14 September 2026

Closed 9 days ago

Added to Civics
12 September 2026
Source category
Local government
Last checked
12 September 2026

Plain-English summary

Environment Southland has requested three changes to the Southland Water and Land Plan: align farm-plan rules for 20–50 hectare properties, allow riverbed work to protect infrastructure, and enable water-quality mitigations.

Read the official consultation material for the detailed proposal, supporting documents and submission method.

Why it matters

The 2025 Freshwater Farm Plan Regulations created a disconnect with the Plan for properties between 20 and 50 hectares.

The changes could enable work in riverbeds to protect bridges and flood protection structures.

The changes could enable wetlands and other physical measures to improve water quality.

Who may care

  • Properties between 20 and 50 hectares
  • Parties likely to be affected by modifications or removal of Plan provisions

How to make a submission

  1. Read the official consultation material.
  2. Submit feedback through the official consultation page before the closing date.

Disclaimer

Civics.nz is an independent plain-English guide and is not an official government website. Always check the official source before making a submission.